S.A.Robotics

Practical Remote Solutions – Enhancing safety
Client Fluor Corporation
Facility DOE Hanford Site
Location Hanford, WA
K-Basin

Hanford K-Basin East

S.A. Robotics designed and fabricated Underwater Long Handled Tools to enable remote removal of debris from the bottom of the K-Basin East Pool, located at the Department of Energy’s Hanford Site.

The Underwater Long Handled Tools were specifically designed to retrieve and cut up miscellaneous items such as piping, cable and other tools used during underwater operations at the Basin. A suite of Long Handled Tools were designed and fabricated to fit through 1 ½ inch grating slots located above the surface of the Basin. The tools were designed using small diameter carbon fiber to allow for easy maneuvering. Each tool extends up to 28 feet, allowing plenty of length for safe, remote removal.

The Underwater Long Handled Tools include the following types of tool ends. The products were provided under a firm fixed-price contract and accelerated schedule.